A global pharmaceutical company is rolling out a new quality document management system. The IT team works in two-week sprints with automated tests in the pipeline. Three weeks before go-live, Quality reminds everyone that the system is GxP and needs to be validated. The team receives the templates: validation plan, user requirements specification, IQ, OQ and PQ protocols, traceability matrix, summary report. Every test step needs an expected result, an actual result, a signature, a date and a screenshot.

The next six weeks (three were never going to be enough) go into manually clicking through functions that automated tests have been checking for months. Two thousand screenshots land in the document repository. Nobody asks which of those functions could harm a patient and which change the color of a header. Six months after go-live, an inspector asks something else entirely: who reviews the audit trail in the document approval module, and how often? The two thousand screenshots do not answer that question.

This article is for IT, QA and compliance teams in life sciences companies, and for vendors doing life sciences software development for them. The position we defend may sound risky to anyone raised on traditional CSV: the volume of test documentation says nothing about the quality of validation, and in 2026 regulators are saying so in plain words. The weakest points in GxP computer system validation rarely sit in testing. They sit in a poorly described intended use, in data integrity requirements that nobody turned into code, in vendor oversight and in what happens to the system after go-live. That is where an IT team should spend the effort it currently spends on screenshots.

Why does GxP validation start with intended use and a system inventory, not with testing?

Because every applicable document, European and American, measures a system against what it is for. 21 CFR 11.10(a) requires validation of systems “to ensure accuracy, reliability, consistent intended performance, and the ability to discern invalid or altered records.” The FDA’s Computer Software Assurance guidance opens its framework with identifying the intended use of a software feature, function or operation. The draft revision of EU GMP Annex 11 is built around system requirements and quality risk management. All of them assume that before you test anything, you know what the system is supposed to do in the regulated process.

In practice intended use is often written as a single sentence, such as “the system manages quality documentation.” That sentence decides nothing. A breakdown into functions does: the system stores approved procedures, routes a document to named approver roles, captures an electronic signature, locks editing after approval, sends review-due reminders, produces a training report. Only with that list can you ask, item by item, what happens if this function fails. Could a wrongly approved procedure reach the shop floor? Could someone perform a task they were never trained for?

That question belongs to the business process owner and Quality, but the IT team should force it. If user requirements are a list of screens rather than a list of process functions, the rest of the validation will test screens. IT is the only party that sees the system from the inside and can say that “approve document” is technically six operations, two of which matter for quality and four of which are convenience. Without that knowledge Quality will either overrate the risk of everything or miss what matters.

Intended use also sets the scope: which systems need validation at all. GxP validation applies to computerized systems used in activities covered by good practice regulations: manufacturing (GMP), laboratory (GLP), clinical (GCP), distribution (GDP) and pharmacovigilance. The test is function, not technology. An ERP system is GxP if it holds batch release status or inventory of quality-controlled materials. A spreadsheet is GxP if someone calculates a test result in it. A cloud platform is GxP if it stores records required by regulation.

The FDA’s CSA guidance draws this line with a cloud storage example. An IaaS storage solution that holds production and quality records required by regulation falls under quality system obligations, including functions relevant to record integrity and 21 CFR Part 11. The same solution, used to store data regardless of whether it is required by regulation, does not support production or the quality system and does not call for the same approach. What the system does in the process decides, not what kind of system it is.

Keep two things apart that often blur in healthcare software discussions. Software that is itself a medical device, because it diagnoses, monitors or supports a treatment decision, falls under device regulations such as the EU MDR and IEC 62304; we covered that lifecycle in our article on software as a medical device and IEC 62304. Computer system validation is about something else: the tools a company uses to manufacture, test and distribute products or to run clinical trials. A LIMS, MES, eQMS, electronic batch record or electronic data capture system is not a medical device, but a defect in it can end in a defective batch or a false study result. A device manufacturer can face both at once: its product under IEC 62304 and its production systems under CSA.

The IT team’s first deliverable is therefore an inventory: every system, a GxP or non-GxP classification and a rationale for each. Include the systems IT does not know about because a business unit bought them on a credit card: survey tools used in studies, SaaS training platforms, cloud spreadsheets. When an inspector asks why a system is out of scope, “we did not know it existed” is the worst possible answer.

What does EU GMP Annex 11 require, and what does the draft revision change?

EU GMP Annex 11, “Computerised Systems”, is an annex to EudraLex Volume 4, the EU guidelines on good manufacturing practice. The current version dates from January 2011 and runs to five pages. Several clauses are aimed squarely at IT teams and vendors. Clause 1 requires risk management throughout the system lifecycle. Clause 3.1 requires formal agreements with third parties that supply, install, configure, integrate, validate, maintain (including remotely), modify or retain a system, with clear statements of their responsibilities, and adds a sentence IT departments often forget: internal IT departments should be considered analogous. Clause 3.2 says the need for a supplier audit should be based on a risk assessment. Clause 3.3 requires regulated users to review documentation supplied with commercial off-the-shelf products to check that user requirements are met.

Further clauses cover operation. Clause 9 deals with audit trails: based on risk assessment, consider building in a system-generated record of all GMP-relevant changes and deletions, with the reason for change documented, and audit trails must be available, convertible to an intelligible form and regularly reviewed. Clause 10 requires changes, including configuration changes, to be made in a controlled manner under a defined procedure. Clause 11 requires periodic evaluation to confirm that the system remains in a valid state, covering items such as deviations, incidents, upgrade history, performance, security and validation status.

Since July 2025 the direction of travel has been public. From July 7 to October 7, 2025, the European Commission consulted on three drafts: a revised Chapter 4 (documentation), a revised Annex 11 and a new Annex 22 on artificial intelligence. They were prepared by the EMA GMDP Inspectors Working Group together with PIC/S. The draft Annex 11 has seventeen sections instead of a handful of short clauses, with dedicated parts on system requirements, supplier and service management, qualification and validation, identity and access management, audit trails, electronic signatures, periodic review, security, backup and archiving.

A few changes in the draft are worth knowing now. Data integrity is tied explicitly to ALCOA+, defined in the glossary. A regulated user that relies on a service provider or an internal IT department must exercise effective oversight through agreed SLAs and KPIs, and the contract must describe the documentation to be provided, regular, ad hoc and incident reporting, conditions for supplier audits and support during regulatory inspections. Audit trail review gets its own requirements: a documented procedure, reviewers who are not directly involved in generating the data, timing proportionate to process risk, and, for data with a direct impact on batch release, review before release.

As of mid-November 2026, the EudraLex Volume 4 page still lists the January 2011 Annex 11. The draft is therefore not a requirement in force and should not be cited as one in validation documents. But a team designing a new GxP system today, with a ten-year operational horizon, should design for the draft, because rebuilding an audit trail after new rules take effect costs far more than designing it right the first time.

What does 21 CFR Part 11 require, and why do predicate rules matter more?

21 CFR Part 11 is the FDA regulation on electronic records and electronic signatures, effective since August 20, 1997. It applies to electronic records that a company creates, modifies, maintains or transmits under other FDA requirements. Section 11.10 lists controls for closed systems, and for an IT team it is the most concrete text in the whole field: system validation; the ability to generate accurate and complete copies of records in human-readable and electronic form; protection of records throughout the retention period; limiting access to authorized individuals; secure, computer-generated, time-stamped audit trails that independently record operator entries and actions that create, modify or delete records without obscuring previous values; operational sequencing checks; authority checks; device checks; training of people who develop, maintain or use the system; and control over system documentation.

Most of these translate directly into non-functional requirements you can test like any others. “The audit trail does not obscure previously recorded information” is a test: change a record three times and check that all four values are visible with author and timestamp. “Copies in electronic form” is an export test. “Limiting access to authorized individuals” is a set of role matrix tests. A team that has these requirements in the backlog from sprint one implements them once. A team that discovers them during validation rebuilds the data model.

What Part 11 does not do is equally important. In its 2003 guidance “Part 11, Electronic Records; Electronic Signatures – Scope and Application”, the FDA announced a narrow interpretation of Part 11’s scope and said it would exercise enforcement discretion over certain requirements, including validation, audit trails, record retention and record copying, as described in that guidance. It also made clear that records must still meet the underlying predicate rules, the GMP, GLP and GCP regulations that say which records must be kept at all, and that the agency can take action for non-compliance with those rules.

The practical takeaway for IT: Part 11 answers “how,” predicate rules answer “what.” Before you build a Part 11-compliant electronic signature, establish which predicate rule requires a signature on that particular record. Sometimes the answer is “none,” and an ordinary approval step with user identification is enough. Sometimes it goes the other way: a team builds an elaborate signature mechanism where none is required and skips the audit trail on a record that a predicate rule requires to be kept and that someone could quietly edit.

How does CSA differ from traditional CSV, and who does it formally apply to?

In many companies traditional CSV looks like the story at the top of this article: every function gets a scripted test with steps, expected result, actual result, signature and screenshot, whether or not a failure could hurt anyone. No regulation demands this. It comes from a culture in which thicker evidence is better evidence and from fear that an inspector will challenge every missing screenshot.

Computer Software Assurance is the FDA’s attempt to change that culture. “Computer Software Assurance for Production and Quality Management System Software” was issued as final guidance on September 24, 2025, and on February 3, 2026 the FDA issued a superseding version aligned with the Quality Management System Regulation. That amendment to 21 CFR Part 820 took effect on February 2, 2026 and incorporates ISO 13485:2016 by reference. The guidance supplements the FDA’s older “General Principles of Software Validation” and supersedes its Section 6 on validation of automated process equipment and quality system software.

The CSA framework has four steps: identify intended use, determine a risk-based approach, determine appropriate assurance activities, establish the appropriate record. The pivotal concept is high process risk: the FDA considers a software feature, function or operation to pose a high process risk when its failure to perform as intended may result in a quality problem that foreseeably compromises safety. For those functions a manufacturer may consider more rigor, such as scripted testing or a hybrid of scripted and unscripted testing. For the rest it may consider unscripted methods: scenario testing (also called ad hoc testing), error guessing and exploratory testing. The FDA is careful to say these are examples, not a fixed mapping: unscripted testing may be better suited even for some high process risk features, and a manufacturer may script and automate tests for features that are not high risk.

Now the caveat many CSA articles lose. The guidance was issued by CDRH and CBER and covers software used in medical device production or in a device manufacturer’s quality management system. It is not guidance for drug manufacturers under drug GMP regulations, and it does not change Annex 11 or the predicate rules for medicinal products. A pharmaceutical company that writes “we apply CSA per FDA guidance” in its validation plan is leaning on a document that does not formally apply to it. The safer route is to base the same thinking on the quality risk management Annex 11 already requires and on GAMP 5, citing CSA as a source of examples. Same logic, correct footing.

What does GAMP 5 Second Edition tell an IT team that works in an agile way?

GAMP 5 is the ISPE (International Society for Pharmaceutical Engineering) guide to a risk-based approach to compliant GxP computerized systems. It is not a regulation, but it is the most widely cited description of good practice in the industry and the shared vocabulary of Quality, IT and vendors. The Second Edition was published in July 2022. According to ISPE, it gives greater weight to service providers and encourages fuller use of supplier knowledge and documentation, states that the specification and verification approach is not inherently linear and supports iterative and incremental methods, encourages wider use of tools and automation, expects subject matter experts to apply critical thinking when choosing an approach, discusses the FDA’s CSA work and extends its appendices to topics such as cloud computing, AI and machine learning, open-source software and blockchain.

For a Scrum team the key line is the one about linearity. For years validation meant the V-model: complete requirements, then design, then build, then tests in reverse order, then a report. The V-model is a good map of how documents depend on each other, but it does not have to be the project plan. GAMP 5 Second Edition lets requirements, design and verification grow incrementally, provided that at release there is a coherent, approved picture of what the system must do, how it was built, how it was verified and with what result. In GxP, agility is about how you arrive at the evidence, not whether the evidence exists.

The second shift concerns tools. If requirements live in Jira, tests live in a test management tool and automated results flow in from the CI pipeline, traceability from requirement to result can be generated rather than maintained by hand in a word processor table. Tools have to be assessed for their role, because the tool that stores validation evidence affects how trustworthy that evidence is. But assessing a test management tool is usually a one-off, low-risk job, not a reason to go back to paper. We compared TestRail, Xray and Zephyr for this kind of setup in our TestRail implementation guide.

The third shift is critical thinking. It sounds vague, but in practice it means a template stops being an excuse. If the validation procedure demands an OQ protocol for every function and an expert can see that half of them need only a review of vendor documentation and a scenario test, GAMP 5 Second Edition gives that expert an argument to change the procedure. That change happens in the company’s quality system, not in IT, but IT is usually the first to see the absurdity and should raise it.

How do you turn ALCOA+ into requirements a developer can build?

ALCOA+ stands for attributable, legible, contemporaneous, original and accurate, extended with complete, consistent, enduring and available. The draft Annex 11 defines it exactly that way and links data integrity to its sections on handling of data, identity and access management, audit trails, electronic signatures and security. In quality documents ALCOA+ often lives as a slogan on a poster. It becomes useful to an IT team only when each letter turns into a requirement that can be built and tested.

Attributable. Every record has an author who is a specific person, not a shared account. Requirements: no group accounts in roles that create GxP data; integration service accounts distinguished from human accounts and documented; the audit trail stores a user identifier, not just a display name that can change. Legible. Data stays readable for the whole retention period, including after migration to a new system. Requirement: export to an application-independent format with metadata and audit trail. Contemporaneous. The record is made when the action happens. Requirements: timestamps assigned by a server with a synchronized clock rather than by the user’s browser, no back-dating, an explicit time zone.

Original. The first capture or a verified true copy. Requirements: when data arrives from a lab instrument, the system keeps the raw file, not only the calculated result, and every transformation is reproducible. Accurate. Requirements: input validation, range checks, verification of calculations, integration tests against source systems. Complete, consistent, enduring and available. Requirements: deletion of GxP data only as an operation recorded in the audit trail, never as a silent physical delete; a consistent sequence of events; backups with regularly tested restores; the ability to hand data to an inspector within a reasonable time.

Each of these is easier as an architectural decision than as a patch. If the data model stores records as immutable versions with author and time from day one, the audit trail is a property of the system. If the data model overwrites records and the audit trail is a separate table fed by application code, every new write path (an import, an integration, an administrator’s fix-up script) is a potential hole. The key GxP question is: is there any path that changes data without leaving a trace? If a database administrator can run an UPDATE directly against a table, the answer is yes, and it has to be handled either procedurally or technically.

How do you scale test rigor to process risk?

This is the heart of the shift from CSV to CSA and the most common source of misunderstanding. A risk-based approach does not mean “test less.” It means “test differently in different places”: more rigor, independent verification and formal records where a failure can harm a patient or product quality, and less ceremony where it cannot. It is the same principle as risk-based testing in any project, except that in GxP the risk assessment is itself a document an inspector can read.

The FDA’s CSA guidance illustrates this with ERP examples. A function whose failure could cause a quality problem that compromises safety, such as releasing nonconforming material, is high process risk. A function whose failure would not foreseeably lead to such a problem, for example because independent downstream controls exist, is not. The FDA presents the two categories as binary but notes that process risk is a spectrum and a manufacturer may define more levels. The table below shows how that split can look in an IT team’s day-to-day work. The examples are illustrative: final risk assignment belongs to the process owner and Quality.

Example GxP system functionRisk questionProposed levelAssurance activitiesRecord
Blocking batch release when a test result is out of specificationCould a failure release a defective product to patients?High process riskScripted tests of boundary and negative cases, independent configuration review, regression test on every changeTest description, results from the tool, deviations and resolution, conclusion, who and when, approval
Electronic signature on procedure approvalCould a failure put an unapproved document into use?High process riskScripted tests of the role matrix and signing sequence, audit trail testsAs above, referencing the predicate rule requirement
Calculating a result from raw instrument dataCould a failure change the result a decision is based on?High process riskTests against a reference data set, comparison with an independent calculation, raw data retention testData set, comparison results, conclusion
Email reminder for a document review dateIs there an independent control that catches a missed date?Not high process riskScenario or exploratory test, leverage vendor testingShort session note, result, who and when
Trend report for internal monitoringAre GxP decisions made from it?Not high process risk if the answer is noExploratory test, review of vendor documentationShort record, intended use stated as “not used for GxP decisions”
Screen layout, colors, field labelsCould a failure mislead a user performing a GxP task?Usually not high process riskCovered by user acceptance testingUAT result

Look at the last column. Even for functions that are not high risk, a record exists; it is just shorter. The FDA guidance says plainly that documentation of assurance activities need not include more evidence than necessary to show that the function performs as intended for the risk identified. That is not permission to skip the record. It is permission to make it proportionate.

One thing demands discipline from IT: the risk assessment must exist before testing, not after. If a team tests first and then writes a risk rationale that fits the work already done, the whole structure loses its meaning, and an experienced inspector will notice from the document dates.

What evidence should be produced, and where should it live?

The FDA’s CSA guidance lists what the record for a software function should contain: intended use, the result of the risk-based analysis and documentation of the assurance activities. The latter includes a description of the testing performed, issues found (deviations, defects, failures), a conclusion that the software is acceptable for its intended use together with how issues were resolved or why they do not affect intended use, who performed the testing or assessment and when, and review and approval where appropriate.

The second half of that passage matters more for IT. As a least-burdensome approach, the FDA recommends using digital records such as system logs, audit trails and other data generated and maintained by the software, rather than paper documentation, screenshots or duplicating results the software already retains digitally. It adds that digital records must be considered for accuracy, reliability, integrity, availability and authenticity. In other words: an automated test result recorded by the CI pipeline with a commit ID, a timestamp and an environment is evidence, and a screenshot of that same result pasted into a Word document is a weaker copy of it.

That changes how a team writes tests. A test case meant to be GxP evidence must be repeatable by someone else with the same outcome, and it must state clearly what it checks and against which acceptance criterion. We covered how to write such cases in our article on test scenarios and test cases someone else can run. GxP adds one more rule: the version of the test case that was executed must be preserved, even if the case changes later.

Where should all this live? In a system that itself meets record requirements, meaning access control, an audit trail and backups, and that has been assessed for that role. A typical setup is requirements in a work management tool, test cases and results in a test management tool linked to those requirements, automated results imported from CI, and documents that need formal approval (validation plan, risk assessment, summary report) in the eQMS. What matters is that traceability from requirement through risk to evidence can be shown to an inspector in minutes, not days.

How do you treat a vendor as part of the quality system?

The biggest mindset change for IT teams and for vendors is this: the supplier of a GxP system is not just a seller but an element of the regulated company’s quality system. The 2011 Annex 11 requires formal agreements that state the supplier’s responsibilities, an assessment of the supplier’s competence and reliability, an audit where risk assessment calls for it, and availability of supplier quality system information to inspectors on request. The draft revision goes further: oversight through SLAs and KPIs, documentation the regulated user must be able to explain from its own site, and a concrete list of contract contents.

Assessing a vendor does not have to mean an on-site audit. The FDA’s CSA guidance acknowledges that manufacturers may have limited access to vendor information and that auditing a software vendor may not be feasible or appropriate. It lists activities to consider instead of or alongside an audit: reviewing the vendor’s accreditations and certifications (for example SOC reports and ISO certifications), reviewing its practices and documentation for software development, quality assurance and cybersecurity (security risk assessments, threat modeling, design reviews, software bill of materials, testing), and reviewing the software’s data integrity controls. The draft Annex 11 speaks of an audit or thorough assessment scaled to risk and system criticality, and of leveraging the vendor’s work rather than repeating it.

That last point is where the money is. If the vendor has a mature development process and shares its test results, the regulated company does not need to retest standard functions from scratch. The FDA guidance says outright that a manufacturer can take the software development practices, validation work and electronic information already produced by the developers as a starting point and decide what additional activities are needed, and that for some lower-risk functions this may be all the assurance required. The condition is that the company evaluates that work rather than taking it on faith.

What belongs in a contract or quality agreement with a GxP system vendor? Drawing on the draft Annex 11 and common practice: the activities and documentation the vendor provides; the company procedures and regulatory requirements the vendor must meet; regular, ad hoc and incident reporting, response and resolution times, SLAs and KPIs; supplier audit conditions; support during inspections. Add advance notice of changes and new releases, data access and return at contract end, data location and subcontractors. The same logic applies when you bring in outside testers to work on a GxP system; we explained why you should not outsource the definition of quality itself in our article on who defines quality when you outsource QA.

If you are on the other side, building software for life sciences companies, the lesson is symmetrical. Your development process documentation, automated test results, change history and security policy are validation material for your customer. The easier you make them to access in an orderly form, the less the customer has to repeat, and the more valuable you are to them.

How do you validate a SaaS application whose releases you do not control?

Traditional validation assumes the company controls when change happens: the system is frozen in its validated state and every update goes through change control. SaaS breaks that assumption. The vendor ships new versions on its own schedule, often several times a year, sometimes more, and every customer gets them at once. Companies tend to respond in one of two bad ways: pretend the SaaS is frozen and never assess updates, or treat every update as a new validation project and drown.

The FDA’s CSA guidance explicitly covers IaaS, PaaS and SaaS used in production or the quality management system, and includes a worked example of a SaaS product lifecycle management system. The draft Annex 11 opens by noting an evolving IT landscape and increased use of cloud services. The direction is clear: validating SaaS is possible, but it rests on a different split of work.

The vendor keeps what the company cannot control: infrastructure, application code and its testing, platform security, service-level backups. The company covers those through vendor assessment and the contract. The company keeps what is its own: configuration, roles and permissions, business processes built on the platform, integrations with other systems, data migration, user training and procedures. That is what validation tests, with rigor scaled to risk.

Each vendor release needs a short, repeatable process: review the release notes, assess the impact on functions used in GxP processes, decide the scope of regression testing, run those tests in a non-production environment before the change reaches production (where the vendor allows it) and record the outcome. This is where automated regression tests on critical paths pay back fastest, because they run with every release rather than once. The precondition is a contract that guarantees advance release notice and access to an environment where the new version can be checked before it reaches production tenants. If the vendor does not offer that, it is an input to the vendor risk assessment, not something to sweep under the rug.

How do you keep a system in a validated state after go-live?

A validation report signed on go-live day describes the system on that day. An inspector arrives one, two or five years later and asks whether it is still in that state. The 2011 Annex 11 requires controlled change under a defined procedure and periodic evaluation of whether the system remains validated. The draft revision expands periodic review into a list of topics including actions from previous reviews, audits and inspections, audit trail and access reviews, and support contracts and SLAs.

For IT, the validated state is maintained in four places. The first is change control: every change, configuration included, gets an impact assessment and a verification scope proportionate to risk. In a team with a CI pipeline, that can mean the regression suite for critical functions is a gate nobody can bypass, and production configuration changes go through the same review as code changes. The second is access management: regular review of accounts and roles, prompt removal of rights when people change jobs or leave, and separate, sparingly used administrator accounts.

The third is audit trail review. The current Annex 11 requires regular review; the draft is more specific: under a procedure, by people not directly involved in generating the data, on a timeline proportionate to risk, and before batch release for data that affects it. The draft also encourages tools that help with review. IT can help a great deal by building reports that surface exceptions (changes after approval, deletions, out-of-hours changes, changes by administrator accounts) rather than making reviewers scroll through thousands of rows.

The fourth is backup and restore. A backup whose restore nobody has tested is not evidence that data is enduring and available. A restore test with a recorded result belongs in the system’s operating plan, not as a one-off line in a qualification protocol.

How should IT and QA organize the work on a GxP system project?

Knowing the regulations is necessary, but projects succeed or fail on how roles are sequenced. The most common mistake is splitting build and validation into two consecutive phases with two teams. The delivery team builds in sprints, then a validation team arrives at the end with templates and starts over. The result is the story at the top of this article: duplicated work, delay and evidence that does not answer the inspector’s questions.

A better setup starts with joint work on intended use and risk in the first weeks: the process owner, someone from Quality, the architect and the QA lead. The output is a list of functions with an assigned risk level and a decision on which assurance activities and which evidence each will need. From then on, GxP requirements (ALCOA+, Part 11, Annex 11) go into the backlog as ordinary stories with acceptance criteria, and the definition of done includes evidence in the agreed form. User acceptance testing in GxP follows the same logic as anywhere else, as described in our UAT guide, except that its result is a quality record.

The skills the team needs are fairly specific. Someone has to translate regulatory text into technical requirements and back. Someone has to design a risk-based test strategy and keep traceability intact. Someone has to automate regression tests on critical functions so that their results count as evidence. These roles can be filled from inside the company or from outside, but accountability for approving the approach and the outcome always stays with the regulated company’s Quality unit.

Finally, something that gets forgotten: training. The draft Annex 11 has a dedicated section on personnel and training, and 21 CFR 11.10(i) requires that people who develop, maintain or use electronic record systems have the education, training and experience for their tasks. That includes the vendor’s developers and testers. A short, documented GxP introduction for everyone who joins the project costs little and answers a question an inspector may well ask.

What are the key takeaways for IT and QA teams?

Computer system validation in life sciences in 2026 is not about producing the thickest possible binder. Regulators and the industry say so openly: the FDA in its final Computer Software Assurance guidance, ISPE in GAMP 5 Second Edition, and the European Commission in a draft Annex 11 that emphasizes risk management, supplier oversight and data integrity rather than protocol counts. The effort a team spends today on screenshots of low-risk functions is better spent where the real weaknesses are.

Remember seven things. First, start from intended use broken down into functions, not from a protocol template. Second, build a GxP system inventory with rationales, including SaaS tools bought outside IT, and keep GxP systems separate from software that is itself a medical device. Third, turn ALCOA+ and 21 CFR 11.10 into backlog requirements from sprint one, and treat the audit trail as an architectural decision. Fourth, assess risk before testing and match rigor, methods and evidence to it; unscripted testing and vendor work are legitimate tools where the risk allows. Fifth, base evidence on digital records from your tools, not on copies of screens. Sixth, treat the vendor as part of the quality system: assessment, contract, SLAs and KPIs, audit rights, change notification. Seventh, plan how the validated state will be maintained, especially audit trail review and the process for each SaaS release, before go-live. And remember that CSA formally applies to medical device manufacturers; a pharmaceutical company should ground the same approach in Annex 11 and GAMP 5.

ARDURA Consulting does not replace a regulated company’s Quality unit and does not approve validation. We can help with the part that belongs to IT and QA. Our test strategy and test management package takes two weeks and starts from €3,700: we design a risk-based test strategy and implement TestRail, Xray or Zephyr with test case migration and Jira and CI integration, which is the foundation of traceability from requirement to result. If your team is short of hands for regression testing, automation or running the strategy, we provide QA engineers through staff augmentation who join your team and work under your procedures. Let’s talk about where the biggest risk sits in your project.